Surface

Temporary back-filling complex. Control system for mill МШР3600х5000 (01.03.2006)
Work type:
commissioning
equipment delivery
maintenance (operating) documentation for the automated system of complete delivery
Date of the design work completion: 01.12.2005
Basic hardware of the project: Rockwell Automation (ControlLogix)
Main industrial site. Modular heat point. Complete delivery. (01.03.2009)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
industrial security examination
Date of the design work completion: 01.06.2008
Basic hardware of the project: Rockwell Automation
Main industrial site. Surface back-filling plant. Automated control system (01.10.2010)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
Basic hardware of the project: Rockwell Automation
Provision of equipment for central dispatch control with on-site network for data transmission. (01.08.2010)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
work documentation (detailed design)
Date of the design work completion: 01.03.2010
Basic hardware of the project: Rockwell Automation
AODCS (automated operating dispatch control systems for open-cut and underground mining plants)-II (for complete development). Design of equipment for central dispatch control with on-site network for data transmission (01.12.2007)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
work documentation (detailed design)
Date of the design work completion: 01.03.2007
Basic hardware of the project: Rockwell Automation (RSView32)
AODCS-II (for complete development). “Power supply” subsystem. Surface part (01.12.2007)
Work type:
commissioning
detailed design (the part to be approved and work documentation)
equipment delivery
Date of the design work completion: 01.07.2007
Basic hardware of the project: Schneider Electric; Rockwell Automation
Pit head plant of VKS mine shaft. Automatic ground temperature control system on the top of the mine (permafrost ground, in the Extreme North).
Work type:
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.05.2012
Basic hardware of the project: Rockwell Automation
AODCS (automated operating dispatch control systems for open-cut and underground mining plants). «Power supply» subsystem. Surface part. Switchgear, 6 kV reconstruction. Central Distribution Substation №2. ASDPC, AIMSER
Work type:
equipment delivery
process regulations
Date of the design work completion: 01.04.2014
Basic hardware of the project: Rockwell Automation (ControlLogix)
AODCS (automated operating dispatch control systems for open-cut and underground mining plants)-I (starting complex). Supply of equipment for central dispatch control with on-site network for data transmission (01.08.2009)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
Date of the design work completion: 01.04.2009
Basic hardware of the project: Rockwell Automation
Surface backfilling plant. Automated weighing devices for bulk materials, DVL type (01.12.2009)
Work type:
commissioning
equipment delivery
maintenance (operating) documentation for the automated system of complete delivery
Date of the design work completion: 01.06.2009
Basic hardware of the project: Rockwell Automation
Substation 110/6,3/6,6 кV. Protection relay control system, ASDPC (automated system of dispatching process control). AIMSER (automated information - measurement system of energy resources) . (01.03.2009)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
maintenance (operating) documentation for the automated system of complete delivery
Date of the design work completion: 01.12.2008
Basic hardware of the project: ABB Metronica, SPAX XXX, REX 5XX
AODCS (automated operating dispatch control systems for open-cut and underground mining plants). Subsystem «Ventilation». Main mine fan, main mine heater, auxiliary mine heater plant. (01.11.2012)
Work type:
commissioning
construction-and-assembling operations
design documentation (basic design)
equipment delivery
process regulations
work documentation (detailed design)
Date of the design work completion: 01.06.2011
Basic hardware of the project: Rockwell Automation
Compressor station. Modernisation of control system (replacing Atlas Copco controllers) (01.12.2014)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
work documentation (detailed design)
Date of the design work completion: 01.09.2012
Basic hardware of the project: Rockwell Automation
Main air heater. Automated control system (01.09.2011)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
Date of the design work completion: 01.01.2011
Basic hardware of the project: Rockwell Automation
Biological treatment block capacity 20 000m3 / day (Administration Building. The production building. Block of biological treatment) (01.12.2015)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
Date of the design work completion: 01.12.2013
Basic hardware of the project: Rockwell Automation

Select by:
Work type
Country