Main air heater. Automated control system

Main air heater. Automated control system


Work type:  equipment delivery / construction-and-assembling operations / commissioning
Commissioning date:  01.09.2011
Country:  Russia
Date of the design work completion:  01.01.2011
Basic hardware of the project:  Rockwell Automation