Shaft VS-9. Main fan installation. Modernization of electric drive control system.

Shaft VS-9. Main fan installation. Modernization of electric drive control system.


Work type:  design documentation (basic design) / work documentation (detailed design) / commissioning / construction-and-assembling operations / maintenance (operating) documentation for the automated system of complete delivery / industrial security examination / current process survey followed by the appropriate report elaboration
Commissioning date:  01.03.2012
Country:  Russia
Date of the design work completion:  01.08.2011
Basic hardware of the project:  Siemens