Processing plant

Installation of a frequency-controlled converter on the circulating water pump, item181-3 (01.12.2006)
Work type:
current process survey followed by the appropriate report elaboration
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.12.2005
Basic hardware of the project: Vacon 6kV (two-transformer circuit)
Installation of VFD for ore hydraulic transport pump poz.7-1 (01.12.2006)
Work type:
current process survey followed by the appropriate report elaboration
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.12.2005
Basic hardware of the project: Vacon 6kV (two-transformer circuit)
Installation of VFD for ore hydraulic transport pump poz.120-5
Work type:
current process survey followed by the appropriate report elaboration
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.12.2005
Basic hardware of the project: Robicon 6кВ
Installation of VFD for crashing poz.145-1
Work type:
current process survey followed by the appropriate report elaboration
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 17.12.2005
Basic hardware of the project: Vacon 0,4кВ
Ore bunker loading unit. Updating of the Control system (17.06.2008)
Work type:
commissioning
current process survey followed by the appropriate report elaboration
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 17.03.2006
Basic hardware of the project: Siemens (S7-300)
Stage I, II sieving and X-ray luminescent separation. Automated control system (17.12.2008)
Work type:
commissioning
current process survey followed by the appropriate report elaboration
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 17.07.2007
Basic hardware of the project: Siemens (S7-400)
Recovery workshop. Automated control system (17.12.2011)
Work type:
commissioning
construction-and-assembling operations
current process survey followed by the appropriate report elaboration
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 17.12.2008
Basic hardware of the project: Siemens (S7-300)
Wet self-grinding mill №3. Control system modernisation. (17.11.2012)
Work type:
commissioning
current process survey followed by the appropriate report elaboration
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 17.04.2012
Basic hardware of the project: Siemens (S7-300)
Power supply system. ASDPC (Automated system of dispatching process control), AIMSER (automated information - measurement system of energy resources).
Work type: detailed design (the part to be approved and work documentation)
Date of the design work completion: 18.12.2008
Basic hardware of the project: ABB
Extraction plant. Automated control system for the Radar separator (01.12.2013)
Work type:
commissioning
construction-and-assembling operations
current process survey followed by the appropriate report elaboration
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.12.2012
Basic hardware of the project: Siemens (S7-400)
Block-module heat point TP-PNS2. Complete delivery, turnkey. (18.09.2011)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
industrial security examination
Date of the design work completion: 18.04.2011
Basic hardware of the project: Rockwell Automation
Switchgear, 6 kV. ASDPC (automated system of dispatching process control). AIMSER (automated information - measurement system of energy resources). (18.04.2014)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
work documentation (detailed design)
Date of the design work completion: 18.11.2013
Basic hardware of the project: Rockwell Automation (ControlLogix)
Recycled water supply systems. Automated control system. (18.12.2005)
Work type:
commissioning
current process survey followed by the appropriate report elaboration
Date of the design work completion: 18.05.2005
Basic hardware of the project: Rockwell Automation (ControlLogix)
Power supply system 6/0.4kV. Lighting. Control stations switchboards
Work type: detailed design (the part to be approved and work documentation)
Date of the design work completion: 01.12.2008
Basic hardware of the project: ABB
Control room reconstruction (installation of video wall) (01.12.2013)
Work type:
construction-and-assembling operations
equipment delivery
Basic hardware of the project: Rockwell Automation (ControlLogix)