Automated system for the supply of cooling water to the generators and supplementary equipment of the hydro power plant.

Automated system for the supply of cooling water to the generators and supplementary equipment of the hydro power plant.


Work type:  design documentation (basic design) / statement of work for the automated system or its improvement (reconstruction) / work documentation (detailed design) / current process survey followed by the appropriate report elaboration
Commissioning date:  01.12.2011
Country:  Russia
Date of the design work completion:  01.05.2011
Basic hardware of the project:  Siemens