Underground

AODCS (automated operating dispatch control systems for open-cut and underground mining plants) (starting complex) «Pumping» subsystem. Main pumping unit at the Level +100m. Automated control and monitoring system (01.12.2012)
Work type:
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
industrial security examination
Date of the design work completion: 01.12.2008
Basic hardware of the project: OPTION 1 BMS (Betacontrol) OPTION 2 Trolex (TX2100)
AODCS (automated operating dispatch control systems for open-cut and underground mining plants) (starting complex). Wireless system for emergency warning SUBR-1P (01.09.2010)
Work type:
commissioning
construction-and-assembling operations
Basic hardware of the project: SUBR-1P
Automation sub-systems for underground operations «UAPT&PS», «Power supply», «Mining», «Back-filling», «Water supply», «Water-pumping» (01.03.2011)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
Date of the design work completion: 01.05.2010
Basic hardware of the project: Becker Mining Systems
AODCS (automated operating dispatch control systems for open-cut and underground mining plants), “Technological and safety video observation” subsystem. (01.11.2014)
Work type:
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.06.2012
Basic hardware of the project: SPbEC-Mining
AODCS (automated operating dispatch control systems for open-cut and underground mining plants). “Personnel and transportation monitoring” subsystem. (01.12.2013)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.06.2012
Basic hardware of the project: SPGT-41
AODCS (automated operating dispatch control systems for open-cut and underground mining plants). Provision of sub-systems for “Gas control, automated gas protection, automation of terminal excavations and ventilation”. (01.11.2012)
Work type:
commissioning
construction-and-assembling operations
Date of the design work completion: 01.05.2012
Basic hardware of the project: Trolex, Promtex, Rockwell Automation, SCADA
AODCS (automated operating dispatch control systems for open-cut and underground mining plants)-II (for complete development). Subsystem «Monitoring of underground personnel and personnel transportation». (01.12.2007)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
industrial security examination
work documentation (detailed design)
Date of the design work completion: 01.03.2007
Basic hardware of the project: Becker Mining Systems
AODCS (automated operating dispatch control systems for open-cut and underground mining plants)-II (for complete development). «Power supply» subsystem. Underground part
Work type:
detailed design (the part to be approved and work documentation)
industrial security examination
Date of the design work completion: 01.12.2008
Basic hardware of the project: Becker Mining Systems , Trolex (TX2100)
Main pumping unit at level of -625m. Automated control system. (01.03.2012)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
industrial security examination
work documentation (detailed design)
Date of the design work completion: 01.11.2011
Basic hardware of the project: Becker Mining Systems
Main pumping complex at the level -145. Automated control system
Work type:
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.10.2012
Basic hardware of the project: Becker Mining Systems
Automated control system. Subsystem "Monitoring of personnel and transport SUBR-1P. Modernisation " (01.12.2014)
Work type:
commissioning
construction-and-assembling operations
equipment delivery
work documentation (detailed design)
Date of the design work completion: 01.03.2013
Basic hardware of the project: SPGT-41
Winning at the point +85/0. Skip and cage mine shaft signalling
Work type:
statement of work for the automated system or its improvement (reconstruction)
work documentation (detailed design)
Date of the design work completion: 01.12.2014
Basic hardware of the project: Funke, Huster Fernsig, ШАСС-Микон
AODCS (automated operating dispatch control systems for open-cut and underground mining plants)-I (starting complex). Wireless system for emergency warning and underground personnel and transportation monitoring. (01.07.2009)
Work type:
commissioning
construction-and-assembling operations
detailed design (the part to be approved and work documentation)
equipment delivery
Date of the design work completion: 01.04.2009
Basic hardware of the project: SUBR-1P
Opening and mining up to the level of -615m. Surface and underground facilities. Starting complex - I. Power supply system 110/6.3/6.6kV (01.07.2009)
Work type: design documentation (basic design)
Date of the design work completion: 01.03.2009
Level -310m. Main conveyor line. Automated control system (01.06.2009)
Work type:
commissioning
detailed design (the part to be approved and work documentation)
equipment delivery
Date of the design work completion: 01.12.2008
Basic hardware of the project: Becker Mining Systems

Select by:
Work type
Country