Khabarovsk. Water intake structures of Tunguska field (Phase 1). The pumping station of the 2nd climb. Automated control system

Khabarovsk. Water intake structures of Tunguska field (Phase 1). The pumping station of the 2nd climb. Automated control system


Work type:  current process survey followed by the appropriate report elaboration / statement of work for the automated system or its improvement (reconstruction) / work documentation (detailed design)
Country:  Russia
Date of the design work completion:  01.12.2007 12:18:00
Basic hardware of the project:  Siemens / Robicon