Main and supplementary pumping installations, level -210 m. Automated control system

Main and supplementary pumping installations, level -210 m. Automated control system


Work type:  work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations
Commissioning date:  01.06.2012
Country:  Russia
Date of the design work completion:  01.02.2011
Basic hardware of the project:  Becker Mining Systems