Main pumping unit at level of -625m. Automated control system.

Main pumping unit at level of -625m. Automated control system.


Work type:  work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations / industrial security examination
Commissioning date:  01.03.2012
Country:  Russia
Date of the design work completion:  01.11.2011
Basic hardware of the project:  Becker Mining Systems