Level -310m. Main conveyor line. Automated control system

Level -310m. Main conveyor line. Automated control system


Work type:  detailed design (the part to be approved and work documentation) / equipment delivery / commissioning
Commissioning date:  01.06.2009
Country:  Russia
Date of the design work completion:  01.12.2008
Basic hardware of the project:  Becker Mining Systems