Northeast boiler. Automated control system of water treatment. Reconstruction

Northeast boiler. Automated control system of water treatment. Reconstruction


Work type:  work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date:  01.09.2006 11:18:00
Country:  Russia
Date of the design work completion:  01.05.2006 11:18:00
Basic hardware of the project:  Schneider Electric