SMART-mine "Nurkazgan." Automated dispatching control system

SMART-mine "Nurkazgan." Automated dispatching control system


Work type:  current process survey followed by the appropriate report elaboration / preconstruction alternative engineering / feasibility study
Country:  Kazakhstan
Date of the design work completion:  01.09.2014
Basic hardware of the project:  Becker Mining Systems