Ukraine. “Zasyad’ko” mine. System of power distribution 0,69 kV

Ukraine. “Zasyad’ko” mine. System of power distribution 0,69 kV


Work type:  work documentation (detailed design)
Country:  Ukraine
Date of the design work completion:  01.02.2010
Basic hardware of the project:  Becker Mining Systems