Automated control system for loading-unloading plant for skips, with tunnel transport and skip hoisting unit.
Automated control system for loading-unloading plant for skips, with tunnel transport and skip hoisting unit.
Work type: statement of work for the automated system or its improvement (reconstruction) / work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date: 01.03.2012
Country: Russia
Date of the design work completion: 01.05.2011
Basic hardware of the project: Funke+Huster Fernsig+ABB+ Rockwell