Automated control system for loading-unloading plant for skips, with tunnel transport and skip hoisting unit.
Automated control system for loading-unloading plant for skips, with tunnel transport and skip hoisting unit.
Work type: detailed design (the part to be approved and work documentation) / equipment delivery / construction-and-assembling operations
Commissioning date: 01.03.2009
Country: Russia
Date of the design work completion: 01.12.2008
Basic hardware of the project: Funke, Huster Fernsig, ABB, Rockwell Automation