Recovery workshop. Automated control system
Recovery workshop. Automated control system
Work type: statement of work for the automated system or its improvement (reconstruction) / work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date: 17.12.2011
Country: Russia
Date of the design work completion: 17.12.2008
Basic hardware of the project: Siemens (S7-300)