Ventilation air lock doors, automated control system
Ventilation air lock doors, automated control system
Work type: commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date: 01.12.2012
Country: Russia
Date of the design work completion: 01.06.2011
Basic hardware of the project: Becker Mining Systems