Main and supplementary pumping installations, Level. -580 and -650m. Automated control system
Main and supplementary pumping installations, Level. -580 and -650m. Automated control system
Work type: commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date: 01.12.2012
Country: Russia
Date of the design work completion: 01.05.2012
Basic hardware of the project: Becker Mining Systems