Cage hoisting installation. Shaft signaling technical re-equipment
Cage hoisting installation. Shaft signaling technical re-equipment
Work type: design documentation (basic design) / work documentation (detailed design) / industrial security examination / current process survey followed by the appropriate report elaboration
Country: Russia
Date of the design work completion: 01.11.2012
Basic hardware of the project: ShASS-Mikon