Pos.Ayhal. Pure water pump station on the creek Oyuur-Yurga. Installation of variable frequency converter, automated control system.
Pos.Ayhal. Pure water pump station on the creek Oyuur-Yurga. Installation of variable frequency converter, automated control system.
Work type: work documentation (detailed design) / commissioning / equipment delivery / construction-and-assembling operations / current process survey followed by the appropriate report elaboration
Commissioning date: 01.12.2007 12:18:00
Country: Russia
Date of the design work completion: 01.12.2005 12:18:00
Basic hardware of the project: Robicon 6кВ / Rockwell Automation